Trackspeed NA/NB EFR Turbo Kits - Currently Not Available
#362
Former Vendor
Thread Starter
iTrader: (31)
Join Date: Nov 2006
Location: Sunnyvale, CA
Posts: 15,442
Total Cats: 2,104
Upper downpipes are here, NB lowers due here next week. There will be a delay on NA uppers, so NA customers will have the option of taking an NB lower and building a custom test pipe or cat pipe to get them on the road quicker (any muffler shop can do this).
#372
Former Vendor
Thread Starter
iTrader: (31)
Join Date: Nov 2006
Location: Sunnyvale, CA
Posts: 15,442
Total Cats: 2,104
NA pipes are due here on/around the 19th of this month. Will ship same day to NA guys. If any NA guys want an NB pipe now (if you are doing a custom exhaust anyway, for instance), just shoot me an email and I can send one on Monday.
#374
I emailed also - no reply. Maybe email abyss.
What intercooler are you using?
Maybe 2017.
3 months ago - any status? This is what has held me back from buying the kit. The fact that it's a) incomplete, b) delivery time is completely unknown, and c) poor communication.
See above post from 3mo ago. Or just run without the IC, what could possibly happen?
I'm on my 3rd week of driving with the new manifold and turbo. Things are going well, no problems to report from either. I found a few head/manifold nuts loose on their studs over the weekend, probably a result of my cross-country commute. After re-torquing them I haven't seen them loose since. Stage8 hardware is holding true and the studs haven't moved either. Replaced that breather filter with a parts store cheapie (non-k&n) and haven't had the melty issues since as well. Had to flush the brake fluid though, d4 brake fluid is already getting toasted without a shield
Intercooler and piping is next, yes. I have rough protos built but still need to polish them up and get first articles from my supplier. Concurrent development will happen on a heat shielding solution for the turbine/downpipe to keep the heater hoses, brake lines, etc. all happy and alive.
See above post from 3mo ago. Or just run without the IC, what could possibly happen?
#375
Where are you guys sending emails to? Andrew usually replies within a few hours - usually minutes.
info@trackspeedengineering.com
info@trackspeedengineering.com
#376
Former Vendor
Thread Starter
iTrader: (31)
Join Date: Nov 2006
Location: Sunnyvale, CA
Posts: 15,442
Total Cats: 2,104
Sometimes I can get back to quick emails immediately, and sometimes I'm up to my elbows in grease (like this week). I try to tag anything that needs a reply and run through that list every 48hrs. If you don't see a reply in that timeframe, just bug me again.
#378
Just unboxed the down pipe and oil/water lines kit. Wow is all I can say. The welds on the vband are so nice as well as on the flex joint and cat flange. Super nice down pipe and definitely worth the wait.
Great job on everything so far Andrew! This ******* rocks so hard.
Can't remember my sign on for flickr. Sorry. Also picture quality sucks. I took these on my way out the door for work in my garage at 6am. I ask for mercy.
Great job on everything so far Andrew! This ******* rocks so hard.
Can't remember my sign on for flickr. Sorry. Also picture quality sucks. I took these on my way out the door for work in my garage at 6am. I ask for mercy.
Last edited by stoves; 09-16-2016 at 07:07 AM.