Begi S-2 install
#1
Junior Member
Thread Starter
iTrader: (2)
Join Date: Feb 2008
Location: Ventura, CA.
Posts: 220
Total Cats: 0
Begi S-2 install
Got part of kit this week and figured I would get a jump on prep and install while I wait for back ordered items
Just like everyone else I was giving way too much thought to drilling oil pan..After getting under car and looking up.. I decided to rip out everything having to do with a/c...so much more room to work with.That took about 30 mins. Drilling and tapping..took like 20 minutes...going slow and using lots of grease, and stepping up bit size a little at a time. If you dont have a bit stop you can do what I did to insure you dont go in too far. Stack a bunch of nuts on the drill bit then a few washers on the end till you have about 1/4 inch of the tip sticking out..this will insure you dont go in too far. tap went in straight no need for JB weld or any other quick fix.
Intercooler in...AFM delete done new IAT sensor installed in inlet...just waiting for turbo..DP..some steel braided lines..and clamps. With a little luck they will get here before next weekend.
While I'm waiting for those I will clean up all the rats nest of wires in the dash and install gauges in center vents.
just a quick thanks to everyone who has shared info and tips, made things so much easier...and instead of asking stupid questions at every little problem and pissing off senior members...search..search..and search some more and usually you find what you are looking for.
Just like everyone else I was giving way too much thought to drilling oil pan..After getting under car and looking up.. I decided to rip out everything having to do with a/c...so much more room to work with.That took about 30 mins. Drilling and tapping..took like 20 minutes...going slow and using lots of grease, and stepping up bit size a little at a time. If you dont have a bit stop you can do what I did to insure you dont go in too far. Stack a bunch of nuts on the drill bit then a few washers on the end till you have about 1/4 inch of the tip sticking out..this will insure you dont go in too far. tap went in straight no need for JB weld or any other quick fix.
Intercooler in...AFM delete done new IAT sensor installed in inlet...just waiting for turbo..DP..some steel braided lines..and clamps. With a little luck they will get here before next weekend.
While I'm waiting for those I will clean up all the rats nest of wires in the dash and install gauges in center vents.
just a quick thanks to everyone who has shared info and tips, made things so much easier...and instead of asking stupid questions at every little problem and pissing off senior members...search..search..and search some more and usually you find what you are looking for.
#9
Junior Member
Thread Starter
iTrader: (2)
Join Date: Feb 2008
Location: Ventura, CA.
Posts: 220
Total Cats: 0
Few more pics
AFM deleted...plug wired to GM IAT...installed on TB inlet tube
Few shots of IC and Tubes..Bypass valve...and gauge install in vents....now all I need is TURBO and Downpipe maybe UPS will visit me this week and I could test drive this weekend
Few shots of IC and Tubes..Bypass valve...and gauge install in vents....now all I need is TURBO and Downpipe maybe UPS will visit me this week and I could test drive this weekend
#12
Junior Member
Thread Starter
iTrader: (2)
Join Date: Feb 2008
Location: Ventura, CA.
Posts: 220
Total Cats: 0
#17
Junior Member
Thread Starter
iTrader: (2)
Join Date: Feb 2008
Location: Ventura, CA.
Posts: 220
Total Cats: 0
Well build is on hold...the remainder of parts are waiting for backorder now would be a good time to go over wiring and grounds. Will update with pics when I finish.....soon I hope